RISK ACCEPTANCE REQUEST FORM

Business Owner Acceptance · Residual Risk · Per-RMF-001 Authority · Conditions · Expiration


Document ID CERG-TMPL-RM-004
Version 1.2
Status Approved
Classification Public
Owner Risk Register Owner
Parent Document CERG-PRC-RM-001 - Risk Register and Exception Process
Supporting Documents CERG-GOV-RMF-001 · CERG-TMPL-RM-001 · CERG-TMPL-RM-002
Review Cycle Annual / On process or control change
Frameworks NIST 800-30r1 · NIST 800-39 · ISO 31000
Regulations Cross-cutting
Environments All in-scope CERG environments where this template is used

Table of Contents

  1. Purpose and Use
  2. Template Instructions
  3. Fill-In Template
  4. Review and Approval
  5. Document Control

1. Purpose and Use

This form records a formal risk acceptance decision under the authority framework defined in CERG-GOV-RMF-001 §9.7. It is used when leadership chooses to accept residual risk rather than mitigate, transfer, or avoid it.

This form is for risk acceptances only. For deviations from policy or standards (where the control itself is not implemented as written), use the Security Exception Request Form CERG-TMPL-RM-002 — which follows the Governance-tracked exception register workflow.

Key distinction per RMF-001 §9.7a: - Policy Exception (→ TMPL-RM-002): A specific control or standard cannot be met. Governance approves. Risk assesses. The exception lives in the exception register. - Risk Acceptance (→ this form): The residual risk after controls is within appetite. The Business Owner accepts the business consequence. Approval follows the RMF-001 §9.7 authority table. The acceptance lives in the risk register.

Acceptance Is a Business Decision, Not a Security Decision

Security assesses, recommends, and validates. The Business Owner accepts the business consequence of residual risk. No one in Security accepts business risk on behalf of the organization. Every acceptance requires the Business Owner’s documented signature at the authority level specified in RMF-001 §9.7.


2. Template Instructions

  1. Copy this template before use.
  2. Replace every bracketed field with case-specific information.
  3. Do not delete fields that appear not applicable. Mark them Not Applicable and explain why.
  4. Use canonical CERG role names from CERG-GOV-OM-001.
  5. Link risks, findings, acceptances, evidence, and approvals to the system of record.
  6. Store the completed artifact in the evidence library governed by CERG-PRC-AUD-001.
  7. The Business Owner must review and sign Section 4 before submission to CERG.

3. Fill-In Template

3.1 Decision Summary

Field Value
Acceptance ID [RA-YYYY-NNN]
Risk ID [Risk ID from risk register]
Related Exception ID (if any) [EX-YYYY-NNN or N/A]
Risk Statement [Because of... affecting... there is a possibility that... resulting in...]
Requesting Owner [Name / Role]
Affected Systems / Assets [Asset IDs or system names]
Environment [IT / Cloud / SaaS / OT / Hybrid]
Regulatory Scope [CUI / SOX / CIP / Privacy / None]
Residual Risk Rating [Low / Medium / High / Critical]
Residual Risk Score [Likelihood × Impact]
Acceptance Period [Start date to expiration date]
Acceptance Type [Time-bound / Standing]

3.2 Business Decision Box

Decision Question Business Owner / Required Authority Response
What residual business consequence is being accepted? [Plain-language consequence]
Why is acceptance preferable to immediate treatment? [Cost / schedule / operational / reliability / contractual rationale]
What funding or resourcing decision would retire this acceptance? [Decision, owner, estimate, and timing]
What conditions must remain true for this acceptance to stay valid? [Controls, monitoring, scope limits, review triggers]
What event would require immediate re-review or revocation? [Trigger]
Who owns treatment after acceptance? [Named business or technical owner]

3.3 Business Rationale

[Explain why acceptance is the appropriate treatment compared with mitigation, transfer, or avoidance. Address: cost-to-fix vs. residual risk, operational constraints, compensating control adequacy, and regulatory implications.]

3.4 Alternatives Considered

Alternative Reason Not Selected
[Mitigation — implement full control] [Reason]
[Transfer — insurance or vendor] [Reason]
[Avoid — cease the activity] [Reason]

3.5 Risk Assessment (Prepared by CERG Risk)

Area Assessment
Inherent Risk (no controls) [Likelihood × Impact = Score]
Controls in Place [List of existing compensating controls]
Residual Risk (with controls) [Likelihood × Impact = Score]
Residual Rating [Low / Medium / High / Critical]
Threat or Weakness Created [Description]
Affected Data or Process [Scope]
Business Consequence if Unaddressed [Consequence]

3.6 Conditions of Acceptance

Condition Owner Evidence / Monitoring Review Cadence
[Condition] [Owner] [Evidence] [Cadence]

3.7 Expiration and Review

Field Value
Expiration Date [Date]
Review Cadence [Quarterly / Monthly / Per milestone]
Renewal Criteria [Conditions that must be met for renewal]
Trigger for Early Review [Control failure, threat intel change, regulatory change]

4. Review and Approval

Approval authority follows CERG-GOV-RMF-001 §9.7. An acceptance is not valid until all required signatures are recorded.

Role Review Meaning Name Date Decision
Risk Register Owner Confirms risk register entry, scoring accuracy, and linkage completeness. [Name] [Date] Verified / Returned
Risk Pillar Leader Confirms risk assessment methodology and residual score. Recommends disposition. [Name] [Date] Concur / Returned
Engineering Pillar Leader Confirms compensating controls are in place and effective (if controls involve Engineering). [Name] [Date] Concur / Returned
Governance Pillar Leader Confirms regulatory overlay completeness and documentation adequacy. [Name] [Date] Concur / Returned
Business Owner Accepts the business consequence of the residual risk. [Name] [Date] Accept / Decline
CISO Approves High and Critical acceptances per RMF-001 §9.7 authority. [Name] [Date] Approve / Deny
Executive Sponsor Accepts the business consequence for Critical risk acceptance and/or board-notified items per RMF-001 §9.7. [Name] [Date] Accept / Escalate to Board

Approver Note: Approvers may delegate within their authority but shall document the delegation. No acceptance expires automatically; every acceptance at every tier requires a fresh approval cycle at expiration. Renewal more than twice without material progress toward remediation escalates one approval tier above the original approver.


5. Document Control

Field Value
Document ID CERG-TMPL-RM-004
Version 1.2
Status Approved
Effective Date 2026-06-18
Classification Public
Owner Risk Register Owner
Approved By CISO
Parent Document CERG-PRC-RM-001 - Risk Register and Exception Process
Review Cycle Annual; and on process or control change
Next Scheduled Review 2027-06-18
Frameworks NIST 800-30r1 · NIST 800-39 · ISO 31000
Regulations Cross-cutting
Environments All in-scope CERG environments where this template is used

Revision History

Version Date Author Change Summary
1.2 2026-06-18 Governance Pillar Leader Added business-facing decision box for residual consequence, treatment funding, validity conditions, and re-review triggers.
1.1 2026-06-18 Governance Pillar Leader Aligned acceptance type and related-template wording with RMF-001 authority; clarified that TMPL-RM-003 is supporting only and that Executive Sponsor accepts Critical business consequence.
1.0 2026-06-18 Governance Pillar Leader Initial release. Establishes Risk Acceptance Request Form as the distinct workflow for risk acceptances (Business Owner + per-RMF-001 authority), separate from Security Exception Requests (TMPL-RM-002).

Review Triggers

  • Parent procedure or plan change
  • Audit, assessment, or tabletop finding related to this template
  • Role or approval model change
  • Direction from the CISO
Document ID Relationship
Risk Register Templates and Reporting CERG-TMPL-RM-001 Register and reporting schema
Security Exception Request Form CERG-TMPL-RM-002 Governance-tracked policy/standard exception workflow
Risk Acceptance Memo Template CERG-TMPL-RM-003 Optional supporting memo; does not replace this form or RMF-001 approval authority
Risk Register and Exception Process CERG-PRC-RM-001 Governing risk acceptance lifecycle
Risk Management Framework CERG-GOV-RMF-001 Risk acceptance authority table (§9.7)

SURGE, Cyber Engineering, Risk & Governance

Assess it. Accept it. Own it. Review it.


CERG-TMPL-RM-004 · Version 1.2 · Public